Proposed redevelopment of the former York Hotel and Custom House

Turley

Welcome

Welcome to the consultation website for the proposed development of a 248 bed hotel and associated restaurant in central Cardiff.

Under Section 17 of the Planning (Wales) Act 2015 we are carrying out pre-application consultation on the LEOM LLP’s proposals at Custom House and the Former York Hotel, Custom House Street, Cardiff, CF10 1AP. The site location is illustrated on the map to the right. The development proposes the sensitive redevelopment of the Grade II Listed Custom House building, retaining its façade. The former York Hotel will be demolished and replaced as part of the development.

This website provides you with the opportunity to view the draft planning application documents and leave feedback on the proposals.

Draft planning application documents

As part of our planning application we will be submitting the following documents. These documents are in draft form and will be finalised following the pre-application consultation. You can download and view these documents by clicking on the links below:

These forms will be submitted as part of the planning application.

Click here to download (PDF)

This document outlines the design principles and concepts that have been applied to the proposed development and how any site issues have been overcome.

Click here to download (PDF)

The Planning Statement identifies the context and need for a proposed development and includes an assessment of how the proposed development accords with relevant national, regional and local planning and retail policies.

Click here to download (PDF)

An assessment has been made on the significance of heritage assets and value of the site in this document.

Click here to download (PDF)

Economic impact assessments are a specific form of analysis technique which calculate direct, indirect and induced benefits from projects.

Click here to download (PDF)

The Traffic Statement sets out transport issues relating to a proposed development, identifying what measures will be taken, the anticipated impacts and safety for all modes of travel.

Part 1 - Click here to download (PDF)

Part 2 - Click here to download (PDF)

Detailed flood risk and drainage information with regards to the existing site conditions and an assessment of the proposed develop that are provided in this document.

Click here to download (PDF)

The development proposes the sensitive redevelopment of the Grade II Listed Custom House building, retaining its façade. This document sets out how the façade is retained and the demolition takes place.

Click here to download (PDF)

This document measures the existing noise conditions of the building, assess what impact the proposed development could have on the level of noise and identifies what measures will need to be taken to mitigate noise.

Click here to download (PDF)

This report assess the ecological value of the site, the impact the proposed development could have on the ecological value of the site and provides suggestions on how to protect any existing or future ecological features of the site.

Click here to download (PDF)

This report provides information on the geotechnical character and properties of the ground beneath the site, potential risks posed by contamination and ground gas, and an assessment of these ground conditions with reference to the potential impact on the proposed development.

Click here to download (PDF)

Site plan

Have your say

To make you representations about the proposed development you must write to use through any of the following formats or leave your feedback in the comments box below. Please provide your comments by 1st July 2017:

Email


Tel: 02920 344 445

Write to us

Write to us at:
Custom House Consultation
c/o Turley
18 Windsor Place
Cardiff CF10 3BY